Thinking over some initial observations and building out my "to-do" list based on riding the last week.
To-Do's:
Future Nice to Haves:
To-Do's:
- Swap Kouba Lowering Link for OEM Linkage - Installed 6/28/19
- Set rear sag
- Set front and rear compression + rebound - Set 6/28/19
- Inspect + replace coolant - Replaced 6/29/19
- Oil Change (oil + filter) -Replace 7/5/19
- Replace air filter - Replaced 7/5/19
- Inspect + replace spark plug (This could possibly drive a jetting change) - Replace 7/4/19
- Inspect valve clearances - Inspected 7/5/19
- Re-wire front headlight for full low/high beam
- Inspect front turn signal (randomly went out) - Fixed
- Purchase and install extended fuel mixture screw - Installed 7/19/19
- Side Stand Switch Removal - Removed 7/19/19
- Clutch Switch By-pass
- Inspect and grease rear swing arm
Future Nice to Haves:
- Rear rack
- Phone mount with charger - Installed
- Case Covers - Installed
- Large foot pegs
Current
2006 4Runner V8 Limited|| Currently no BRAPS
Past
2007 DRZ400S || 2007 SV650 || 1998 Yamaha RT180 || 1998 XJ Sport || 2002 Subaru WRX Wagon || 1998 XJ Classic || 2002 VW Passat Wagon || 1992 F150 Custom
2006 4Runner V8 Limited|| Currently no BRAPS
Past
2007 DRZ400S || 2007 SV650 || 1998 Yamaha RT180 || 1998 XJ Sport || 2002 Subaru WRX Wagon || 1998 XJ Classic || 2002 VW Passat Wagon || 1992 F150 Custom
