03-03-2006, 09:01 AM
Alright, spoke to some of the guys who expressed interest with the groupbuy and it appears that Hyperfest is the target date to have all our crap installed. With that said, most of us are alsoo getting rollbars that will need to be fabbed which would require this groupbuy to move ahead faster due to length of fabrication time etc etc.
Check the first post for a detailed schedule.
Check the first post for a detailed schedule.
Two feet.
