12-30-2005, 11:10 AM
Whats the worst install you have done? I had an 89 Benz rewire (from the radio to the fader switch and then the fader to the rear amp locations and then the amps to the speakers) which took almost 5 hours...yeah I wasted a bit of time...but most of it was nose to the grindstone.
Jeff Morrison - Used Car Manager
Woodstock Garage, Inc.
Chrysler - Dodge - Jeep - RAM
Current Stable of Mopar Junk
57 Chrysler Windsor 4drHT - 67 Dodge D100 Short Bed Step Side - 71 Dodge Challenger - 91 Chrysler Lebaron LX 33k mile Survivor - 91 Dodge Dakota V8 - 05 Chrysler Crossfire Roadster - 08 Ram 2500 Cummins
Woodstock Garage, Inc.
Chrysler - Dodge - Jeep - RAM
Current Stable of Mopar Junk
57 Chrysler Windsor 4drHT - 67 Dodge D100 Short Bed Step Side - 71 Dodge Challenger - 91 Chrysler Lebaron LX 33k mile Survivor - 91 Dodge Dakota V8 - 05 Chrysler Crossfire Roadster - 08 Ram 2500 Cummins

