06-27-2006, 11:33 PM
Took 2 weeks for the parts to come in, but progress is finally being made. So far:
-JWT intake is installed
-replaced DS LCA and ball joint
-replaced DS strut
-replaced PS ball joint
-replaced PS wheel bearing (there was a ton of play in it)
-installed LCA brace
-installed front sway bar
still need:
-finishing touches on rear progress bar b/c I didn't read the directions
-install pedals so I can actually heel-toe this time
-oil change
-drive around and get used to the car
-JWT intake is installed
-replaced DS LCA and ball joint
-replaced DS strut
-replaced PS ball joint
-replaced PS wheel bearing (there was a ton of play in it)
-installed LCA brace
-installed front sway bar
still need:
-finishing touches on rear progress bar b/c I didn't read the directions
-install pedals so I can actually heel-toe this time
-oil change
-drive around and get used to the car
