06-02-2005, 03:46 AM
Last year the car we are running was wrecked, so it needed quite a bit of body work in the rear...... the car finally showed up at the shop around 3pm this afternoon, and our open test day is tomorrow (er today, thursday) :yikes:
Fortunately we were able to get almost everything done, the car is back together and ready to roll - I just got home for some rest, they were just finishing up the lights and just need to load up the car - 12 hr prep thrash was all sorts of fun. The usual maintenance had to be done and build a new exhaust and lighting system (4 big ass rally lights on the front bumper), route brake ducting, install new swaybar, etc, etc - just lots of shit. Hopefully we'll have no problems tomorrow and get the car sorted out.
Fortunately we were able to get almost everything done, the car is back together and ready to roll - I just got home for some rest, they were just finishing up the lights and just need to load up the car - 12 hr prep thrash was all sorts of fun. The usual maintenance had to be done and build a new exhaust and lighting system (4 big ass rally lights on the front bumper), route brake ducting, install new swaybar, etc, etc - just lots of shit. Hopefully we'll have no problems tomorrow and get the car sorted out.
