02-07-2019, 10:17 AM
(02-07-2019, 09:42 AM)JPolen01 Wrote: Have they been doing wiring or plumbing? Doesn't look like much progress except the tile is (almost) gone.
Kitchen Renos look like that for a bit as prep for cabinetry, fixtures, and flooring take maybe a week to go in. I think when i did my kitchen reno 2 years ago my kitchen looked like that for about 2-3 weeks of the 5 week total work time (one contractor). We did an expansion for an opening and added an external window, so if anything structural is happening it'll look like that for a while.
'19 Golf R
Intro
J Ray's Top Ten
Previous: '99 BMW Z3 2.8L | 2019 Honda Ridgeline | 2010 VW GTI | 2008 CBR 600RR | 2005 Nissan Titan SE King | 2003 Honda CBR 600RR | 1998 Integra RS | 1998 Suzuki GS500e | 1999 Honda Civic Si | 1986 VW GTI 8v
Intro
J Ray's Top Ten
Previous: '99 BMW Z3 2.8L | 2019 Honda Ridgeline | 2010 VW GTI | 2008 CBR 600RR | 2005 Nissan Titan SE King | 2003 Honda CBR 600RR | 1998 Integra RS | 1998 Suzuki GS500e | 1999 Honda Civic Si | 1986 VW GTI 8v
