The following warnings occurred:
Warning [2] Undefined array key 0 - Line: 1669 - File: showthread.php PHP 8.2.30 (Linux)
File Line Function
/inc/class_error.php 153 errorHandler->error
/showthread.php 1669 errorHandler->error_callback
/showthread.php 915 buildtree




The Super Official Homeowners Thread
(12-20-2018, 12:22 PM).RJ Wrote: wishful thinking maybe.  you had one guy doing everything though, these guys have a bunch of subs they use, which is both good and bad.

i was mostly just joking. 3 weeks is ambitious, but shouldn't be an issue for a well-sorted out general contractor and no major issues during the reno.

(12-20-2018, 12:29 PM)Apoc Wrote:
(12-20-2018, 12:04 PM)Sijray21 Wrote: worse if you have a toddler (would not recommend).

I know it's a privilege to be able to do so, but we're 100% on doing any work on the next house before we move in. It will cost us money to do so, but I'm not living with a toddler during reno work - it's bad enough as two moderately functional adults.

100% agree on that. If we're able to renovate our next house before we move in we are definitely doing that.
'19 Golf R

Intro
J Ray's Top Ten

Previous: '99 BMW Z3 2.8L | 2019 Honda Ridgeline2010 VW GTI | 2008 CBR 600RR | 2005 Nissan Titan SE King | 2003 Honda CBR 600RR | 1998 Integra RS | 1998 Suzuki GS500e | 1999 Honda Civic Si | 1986 VW GTI 8v
  Reply


Messages In This Thread

Forum Jump: