11-14-2018, 05:27 PM
Well the trigger is pulled. Ordered the engine stand and new head gaskets today. Pulling the engine means I'll have room to fix a lot of things in the engine bay I wanted to tackle this winter anyways.
Current To Do List:
Brakes
-new brake lines in the engine bay
-hydroboost unit
-move the handbrake to it's own dedicated line*
-add a linelock*
Repaint engine bay
Clean up wiring harnesses and reduce interference
* wishlist items
I'm not sure what exactly I'm going to do with the engine but a road race oil pan is definitely in the future. I'd like to add some roller rockers while I'm at it for ease of mind but those are going to be optional.
Current To Do List:
Brakes
-new brake lines in the engine bay
-hydroboost unit
-move the handbrake to it's own dedicated line*
-add a linelock*
Repaint engine bay
Clean up wiring harnesses and reduce interference
* wishlist items
I'm not sure what exactly I'm going to do with the engine but a road race oil pan is definitely in the future. I'd like to add some roller rockers while I'm at it for ease of mind but those are going to be optional.