07-31-2009, 03:23 PM
Maybe have a talk with him about what the $4-5k entails. If it includes interior removal, kill switch wiring, building seat mounts, paint, and a bunch of other little things then it can add up real fast on the labor bill.
If its $4-5k if you bring him a bare interior with the dash on the floor... then I dont know. I dont think the labor rates have gone up that much since he moved but who knows. Still top notch work, if you want it done perfect the first time then its hard to look anywhere else.
If its $4-5k if you bring him a bare interior with the dash on the floor... then I dont know. I dont think the labor rates have gone up that much since he moved but who knows. Still top notch work, if you want it done perfect the first time then its hard to look anywhere else.
